From measurement to production and delivery

An estimate becomes a confirmed quotation, then an order with reserved material. See the stages you can follow until the goods are ready for delivery or collection.

Technical basis: the Europrofill public catalogue and current production rules.

Open order tracking
Stage
Order and receive
Topic
Order
Reading
2 min
Updated
Illustration · Europrofill truck loaded with profiled sheets for delivery

In detail

The first estimate helps set a budget. Before ordering, dimensions, profile, material and accessories must be confirmed in a quotation describing the actual project.

Once the quotation is accepted, the order is created. Payment conditions are confirmed and material can be reserved for the accepted specification.

The order then passes through the public stages: advance or payment confirmed, material reserved, scheduled for production, in production and ready for delivery.

Production uses the approved profile, material and dimensions. A change requested after reservation or after entering the line may no longer be possible; contact the team immediately.

When goods are ready, delivery or collection is coordinated by phone. Timing, cost and time window depend on the address, product, sheet length and schedule.

You can check the status with the order number and phone used for the order. The public page shows specification and progress without exposing the address, amount, payments or other personal data.

At receipt, compare the product and documents with the confirmed quotation before installation. This keeps the commercial decision, production and delivery tied to one specification.

Visible order stages

StageWhat it meansWhat to check
QuotationSpecification and conditions are confirmedProfile, material, dimensions, accessories
ReservationMaterial is linked to the orderAccepted specification
ProductionSheets enter the plan and lineDiscuss any change immediately
ReadyGoods await delivery or collectionAddress, time window, contact person

Confirm before ordering

The guide explains the decision. The confirmed quotation fixes the facts for your project.

  • Payment conditions and material reservation
  • Order status before any change
  • Address, time window and contact person

Next step

Track the order

Related guides

The same project stage first, then the step that follows.

All guides12 guides
  1. Warranty and batch certificate: what you receive on delivery

    Warranty terms depend on the chosen material. At receipt, compare the product and delivery documents with the confirmed specification before installation.

    Receipt2 min read
  2. How to choose a metal roof tile: Bavaria, Monterey or Bango?

    The three metal-tile models differ in geometry, useful width and maximum length. Compare the profile separately from the material and finish in the quotation.

    Metal roof tiles2 min read
  3. Profiled sheet vs. metal tile — which suits your roof?

    If you're new to the project, you're probably wondering what the difference is. It's simple: the tile is for pitched roofs and a residential look; profiled sheet is for halls, façades and roofs with a slight slope.

    Comparison1 min read

Turn the guide into an estimate.

The calculator gives an indicative estimate. For a sketch or an incomplete configuration, ask for help before the quotation.